Minutes of the meeting held on 6.7.2015 in VC Room, Dak Bhawan on CSI
implementation
Video
conference was held at IInd Floor, Dak Bhawan on 6.7.2015 to discuss the issues
relating to the roll-out of CSI software and to review the preparations level
at PAOs in this regard.
JS
F&A chaired the meeting. JS F&A addressed all the GM(F)s and all the
DA(P)s through VC. She called upon all those present about the need of the hour
for all the PAOs to acquaint themselves with the BBP, various processes and
received the requirements in connection with the roll out of CSI software.
2.
Director (Accounts) explained through PPT various processes involved in F&A
module of CSI software. He explained all the scenarios of F&A module and changes in various roles
in CSI Software in detail through PPT as follows:
a.
Document Posting and Document
reversal
b.
Procurement from Vendor
c.
Master Data and Budget Allocation Process
d.
Procurement for external Vendors
e.
Employee Claim Process
f.
Asset Master
g.
Asset acquisition
h.
Asset Retirement
i.
Asset under Construction
j.
Asset periodic Processing
k.
Asset Overview
l.
Budget Planning
m. Budget Allocation
n.
Costing and Profitability Process flow
o.
CSI Payment Process (with all kinds of scenarios)
p.
Salary disbursement
3. In
conclusion, Director (Accounts) intimated that the Important Points due to roll
out of CSI software that has to be taken care of by all the PAOs are
Ø Familiarization with BBP
Ø Training to staff
Ø Managing the change
Ø Reworking
regrouping of sections
Ø Robust IT system
Ø Seamless/adequate fast bandwidth
Ø IT security ( physical/system/use of pen drive/DVD
Rom)
Ø Analysis of transaction with regard to
accuracy/authorisation
Ø Internal check system
Ø Check of changes in roll authorized individuals
Ø Password management
Ø Data backup
Ø Decentralization of PAO
4. After the presentation by Director (Accounts),
DDG (PAF) addressed all the PAOs. He emphasized all the PAOs to familiarize
with the BBP document to understand the nuts and bolts of various processes and
the roll of PAOs at ‘as is’ and ‘to be’ processes in CSI software.
He further
emphasized all the PAOs have to analyse the slide showing ‘Important Points’ in
the PPT.
5. Director
(Accounts) and DA(P) Jaipur brought out that all the PAOs must attend to the following issues for
the implementation of Roll-out of CSI Software
a.
Liquidation of suspense balances. All out efforts are have to be taken
to liquidate the suspense balances and Adverse balances so that minimum opening
balances will be carried to the new system.
b.
All the pension records/ service books which have to be digitalized.
They have to be kept updated.
c.
For GPF, only 2014-2015 data would be provided to TCS team after taking proper
back-up of the same.
d.
All the broadsheets of all kinds have to be kept ready for Data
Migration into the system. System access not be given.
6. Change Management team has forwarded the
Training Analysis of F&A module. DDG (PAF) has desired all the PAOs to go
through the scenarios and come with further comments so that TCS team may be
confirmed to work on the given guidelines. Training has to be taken seriously.
Initial bottlenecks of the software can be found out only after the roll out in
Pilot circles.
With no further points,
the meeting closed with thanks to chair.